Well Abandonment and Replacement Well Installation in N-Area CX(s) Applied: B3.1 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sludge Batch 8 Qualification: Washing and Defense Waste Processing Facility Simulations (Rad) CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Wind Tower Cathodic Protection CX(s) Applied: B1.19 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Catalyst Characterization CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dredging of the West Hackberry Raw Water Intake Structure CX(s) Applied: B1.3 Date: 08/14/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Achieving Regional Energy Efficiency Potential in the Midwest CX(s) Applied: A9, A11 Date: 08/14/2012 Location(s): Illinois Offices(s): Golden Field Office
Oklahoma-Tribe-Wyandotte Nation of Oklahoma CX(s) Applied: B2.5, B5.1 Date: 08/14/2012 Location(s): Oklahoma Offices(s): Energy Efficiency and Renewable Energy
Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration