Lovell-Yellowtail No. 1 115-kilovolt Transmission Line Culvert Replacement Project, Big Horn County, Wyoming CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Categorical Exclusion Determination
Low-Cost Solution Processed Universal Smart Window Coatings CX(s) Applied: B3.6Date: 06/30/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Sorption of Humate onto SRS Sediment CX(s) Applied: B3.6Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Harney Substation Digital Communications Upgrade CX(s) Applied: B1.7 Date: 06/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Modifications Required on Tanks 13 and 15 CX(s) Applied: B1.3Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Understanding Relationships Between Low Level Metal Influx, Remediated Sediments, and Biological Receptors CX(s) Applied: B3.6Date: 41820 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229) CX(s) Applied: B1.4 Date: 06/30/2014 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Palisades-Swan Valley Transmission Line Rebuild CX(s) Applied: B4.13 Date: 06/30/2014 Location(s): Idaho Offices(s): Bonneville Power Administration
Davis Dam Maintenance Building Installation at the old Davis Dam 69 Kilovolt West Switchyard CX(s) Applied: B4.11Date: 41820 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region