Subcontractor Replacement of the Roof at Building 773-A, Rooms E172 and E174 CX(s) Applied: B1.3Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office
300-296 Waste Site Retrieval Pilot Project CX(s) Applied: B3.6 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Radiological Survey 600 Area Supporting Land CX(s) Applied: B3.1 Date: 07/09/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Photonic Structures for High-Efficiency Daytime Radiative Cooling CX(s) Applied: B3.6Date: 07/08/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Compact, Inexpensive Micro-Reformers for Distributed GTL CX(s) Applied: B3.6Date: 07/08/2014 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Accelerator Division Cryogenic Department Engineering Office and Meson West 9 Work Activity CX(s) Applied: B3.6Date: 41828 Location(s): IllinoisOffices(s): Fermi Site Office
Thurston Hills Property Phase 1 Acquisition Funding CX(s) Applied: B1.25 Date: 07/08/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Remote Closure Switch for Test Reactor Area (TRA)-786 Output Breaker CX(s) Applied: B2.5Date: 41827 Location(s): IdahoOffices(s): Nuclear Energy
Montoe-Custer Miles 38 and 55-58 Access Road Improvements CX(s) Applied: B1.3Date: 41827 Location(s): WashingtonOffices(s): Bonneville Power Administration
Replace ETP Reverse Osmosis (RO) Cooling Towers (CTWs) and Add a Chemical Addition System CX(s) Applied: B1.5Date: 41827 Location(s): South CarolinaOffices(s): Savannah River Operations Office