Willow Creek Building Pedestrian Bridge Replacement CX(s) Applied: B2.5 Date: 08/25/2009 Location(s): Idaho Offices(s): Idaho Operations Office
Rapid Prototyping Machines Support Research and Development CX(s) Applied: B3.6 Date: 08/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Predictive Large Eddy Simulation (LES) Modeling and Validation for High-Pressure Turbulent Flames and Flashback in Hydrogen-Enriched Gas Turbine CX(s) Applied: A9, B3.6 Date: 08/23/2013 Location(s): Texas Offices(s): National Energy Technology Laborat...
Technology Integration Program CX(s) Applied: A9, A11 Date: 08/23/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Technology Integration Program CX(s) Applied: A9, B3.6 Date: 08/23/2013 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
University of California Berkeley--Developing Metal-Organic Frameworks as Adsorbents for Industrial Carbon Capture Application CX(s) Applied: B3.6 Date: 08/23/2013 Location(s): California, Colorado, California Offices(s): Advanced Research Projects Ag...
Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Security Upgrade Project CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region