Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Research and Development of Advanced Electrochemical Energy Storage Devices Enabling a Spectrum of Electrified Vehicles CX(s) Applied: A1, A9, A11 Date: 08/14/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Research and Development of Advanced Electrochemical Energy Storage Devices Enabling a Spectrum of Electrified Vehicles CX(s) Applied: A1, A9, A11 Date: 08/14/2013 Location(s): Michigan Offices(s): National Energy Technology Laboratory
Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect - Task 8 CX(s) Applied: A1, A9, A11 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Fossil Fleet Transition with Fuel Changes and Large Scale Variable Renewable Integration - SUMMARY Categorical Exclusion (CX) CX(s) Applied: A9 Date: 08/14/2013 Location(s): Multiple States Offices(s): National Energy Technology Laboratory
Fire Loop Soil Excavation CX(s) Applied: B3.1, B6.1 Date: 08/14/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Big Eddy-Redmond No.1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: B5.23 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect CX(s) Applied: A9, A11 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Building 4 Lead Paint Abatement & Repainting CX(s) Applied: B2.1, B2.5 Date: 08/13/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory