Subcontractor will provide roof repairs at 763-52N.…
In this final rule, DOE is adopting new and amended energy conservation standards for walk-in coolers and walk-in freezers. DOE has determined that…
The U.S. Department of Energy (DOE) is proposing to administer funding to Ashta Enterprises LLC dba Bula Forge and Machine, Inc. to install a roof-…
In this final rule, DOE is adopting new and amended energy conservation standards for expanded scope electric motors. DOE has determined that new a…
The proposed work activity is to relocate a portable shed from a storage area between Buildings 211-9F and 235-F to the East wall of Building 707-1…
Repair the siding on Building 221-16 F that was damaged during Hurricane Helene.…
The Center Section Air Supply (CSAS) Fan 50 steam heating coils are leaking into the storage room below and need to be replaced with updated equipm…
The old REMACS Heating Ventilation and Air Conditioner (HVAC) unit and uninterruptable power supply (UPS) will be removed from the 15 telephone ro…
The PA system is old and out of date. This DCF replaces some components of the system to update it.…
Replace Cedar Fence and Replace Portal Sign…