The Recipient team will investigate the feasibility of a Direct Air Capture (DAC) Hub at a California location anchored by Siemens Energy’s solid s…
Bonneville Power Administration (BPA) proposes to fund the Washington Department of Fish and Wildlife (WDFW) to construct a new section of fence an…
CX-032123: Tuning Electrocatalytic Reduction of Plasma Pre-Activated CO2 Toward Multicarbon Products
This project will unlock new electrocatalyst design spaces for multicarbon product generation using CO2/CO pre-activation with nonthermal plasma.…
This activity involves loading hydrogen isotopes, hydrogen (protium) and deuterium into sealed vessels containing various hydride-forming metals fr…
Install VTC system in 704-N room 120.…
Nozzle 1 in the 291-H stack is plugged and will be cleaned by flushing air through it.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Install Telecommunications to 704-76E.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs, cooling water effluent head plugs, emergency pu…
Seal Outside Holes at 701-1A.…