Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas
Remove current playground and replace with larger play surface and concrete path to play area…
Rebuild electrical distribution line. Convert 4.5 miles of single phase 6A CWC overhead line to single phase and three phase underground electrical…
Recipient and sub-recipients to standardize the control and communications of modular microgrids. No construction planned during project.…
We propose to continue to use the cylindrical sputtering system in our lab to study and optimize sputtered of Nb3Sn films for SRF cavities.…
Load Solvent from the 900-Series Tanks in H- area outside facilities (OF-H) into Portable Tanks for Transportation Offsite for Final Disposition…
Remove Sump Pump at TRU PAD#6 and Modify Piping.…
The scope of work will include prepping duct wall for paint, and applying paint coatings once wall has been prepped, Rev 1 The maintenance shop in …
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…