Remove old valve pit cover and install new concrete cover at H7.…
To support mission expansion, the SMC Program will increase its capabilities near the current SMC facility by proposing a Tank Trail. The Tank Trai…
This Idaho National Laboratory (INL) project involves the purchase of three (3) items for the USG 130 sponsor. The items include: (1) Mobile Restro…
This revision involves the irradiation of six small test pins provided by Korean Electric Power Corporation (KEPCO) Nuclear Fuel (KNF) in the Idaho…
This Idaho National Laboratory (INL) project involves the purchase of three (3) items for the USG 130 sponsor. The items include: (1) Mobile Restro…
Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basins (904-57G, 904-58G, 904-59G, 904-60G, 904-103G…
The Law Vault (LAWV) Cell process ventilation will be de-energized and the electrical power, controls, and associated alarms will be air-gapped. Th…
MCC-C Cubicle 3A, which feeds power to H-Canyon Center Section Exhaust Fan No. 3, experienced a catastrophic failure and needs to be replaced.…
Modify the 3rd level platform doors at 221-H.…
A 20 foot sealand/conex will be relocated from K-Area to SRPPF for use as a universal waste storage area.…