Building 12-75B Expansion for UPS and Heating, Ventilation and Air Conditioning Upgrade CX(s) Applied: B1.15, B2.1Date: 03/17/2015 Location(s): TexasOffices(s): Pantex Site Office
ION Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6Date: 03/17/2015 Location(s): OtherOffices(s): National Energy Technology Laboratory
Development of Advanced High-Performance Batteries for Plug-In Hybrid Vehicles CX(s) Applied: B3.6Date: 03/17/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
Development of Advanced High-Performance Batteries for Electric Vehicle (EV) Applications CX(s) Applied: B3.6Date: 03/17/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
Development of Advanced High-Performance Batteries for Electric Vehicle Apps CX(s) Applied: B3.6Date: 03/17/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
ION Advanced Solvent Carbon Dioxide Capture Pilot Project CX(s) Applied: B3.6Date: 03/17/2015 Location(s): OtherOffices(s): National Energy Technology Laboratory
Development of Advanced High-Performance Batteries for Plug-In Hybrid Vehicles CX(s) Applied: B3.6Date: 03/17/2015 Location(s): MichiganOffices(s): National Energy Technology Laboratory
Establishment of Horse Riding Trails on SRS CX(s) Applied: B1.13Date: 03/16/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Solar Panels at Municipal Owned Facilities Award Number: DE-EE0003195 CX(s) Applied: B5.1 Congressionally Directed Project Date: 03/16/2015 Location(s): NJ Office(s): Golden Field Office
One Step Hydrogen Reforming through Sorption Enhanced Reforming Award Number: DE-EE0005770 CX(s) Applied: A9, B3.6 Advanced Manufacturing Office Date: 03/16/2015 Location(s): CA Office(s): Golden Field Office