MRCSP Phase III Subtask 1.6.2 Clearwater BO #1 Well Characterization CX(s) Applied: A9, B3.1Date: 03/11/2015 Location(s): OhioOffices(s): National Energy Technology Laboratory
Building 921 Chiller Replacement, National Energy Technology Laboratory, Pittsburgh CX(s) Applied: B1.3Date: 03/11/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
MRCSP Phase III Subtask 1.6.2 Bush #5 Well Characterization CX(s) Applied: A9, B3.1Date: 03/11/2015Location(s): OhioOffices(s): National Energy Technology Laboratory
Del Norte Energy LLC CX(s) Applied: B4.2Date: 03/11/2015 Location(s): OtherOffices(s): Electricity Delivery and Energy Reliability
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
Pick-Sloan Missouri Basin Program- Eastern Division- Rate Order No. WAPA-170 CX(s) Applied: B4.3Date: 03/10/2015 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Upper Great Plains Region
Subcontractor Will Provide Roof Repairs at 703-42A CX(s) Applied: B1.3Date: 03/10/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 707-F CX(s) Applied: B1.3Date: 03/10/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Autonomous, High Accuracy Natural Gas Leak Detection System CX(s) Applied: B3.6Date: 03/09/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Test Reactor Area (TRA)-609 Switchgear Replacement, Rollup Door Installation, and Diesel Removal CX(s) Applied: B1.31Date: 03/09/2015 Location(s): IdahoOffices(s): Nuclear Energy