Replacement of Control Panel 670-E-80 (Outer Shim and Safety Rod Drive Motor Control Centers) CX(s) Applied: B2.2Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-774 Substation Equipment Upgrades CX(s) Applied: B2.5Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
SAM-1 Hydraulic Shuttle Irradiation System (HSIS) Experiments CX(s) Applied: B3.6Date: 03/02/2015 Location(s): IdahoOffices(s): Nuclear Energy
Global-Optimal Power Flow (G-OPF) CX(s) Applied: A9, B3.6Date: 03/02/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Garrison Substation Equipment Acquisition CX(s) Applied: B1.7Date: 03/02/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Field Demonstration of Chemical Flooding of the Trembley Oilfield, Reno County, Kansas CX(s) Applied: A9, B3.6Date: 02/26/2015 Location(s): KansasOffices(s): National Energy Technology Laboratory
Magnetohydrodynamics Laboratory CX(s) Applied: B3.6Date: 02/26/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
285-H Instrument Air Compressor System Shed CX(s) Applied: B1.15Date: 02/26/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Actinide Removal Process (ARP)/Modular Caustic Side Solvent Extraction Unit (MCU) Life Extension Support Testing CX(s) Applied: B3.6Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at K Reactor (918 Fan Room) CX(s) Applied: B1.3Date: 02/26/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office