Subcontractor Will Provide Roof Repairs at 703-H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 225-8H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Final Rulemaking for Energy Conservation Standards for Pumps RIN 1904-AC54 CX(s) Applied: B5.1 EERE-Buildings Technology Program Date: 11/20/2015 Location(s): Nationwide Office(s): Golden Field Office
Subcontractor Will Provide Roof Repairs at 704-H CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace River Water Pelton Valves if Necessary and Remove Existing Valve Houses CX(s) Applied: B1.3Date: 11/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
M-Area Hazardous Waste Management Facility: Installation of Piezometers/Groundwater Monitoring Wells Downgradient of the Distal Portion of the A-Area Burning/Rubble Pits and Rubble Pit/Miscellaneous Chemical Basin/Metals Burning Pit (ABRP/MCB/MCP) Oper...
Proposed Rulemaking for Energy Conservation Standards for Commercial Boilers RIN 1904-AD01 CX(s) Applied: B5.1 EERE-Buildings Technology Program Date: 11/20/2015 Location(s): Nationwide Office(s): Golden Field Office
Proposed Rulemaking for Energy Conservation Standards for General Service Lamps RIN 1904-AD09 CX(s) Applied: B5.1 EERE-Buildings Technology Program Date: 11/20/2015 Location(s): Nationwide Office(s): Golden Field Office
Test Reactor Area (TRA)-653 Machine Shop Reconfiguration and Equipment Installation Project CX(s) Applied: B1.31Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy
Test Reactor Area (TRA)-1608 Water Fountain Replacement CX(s) Applied: B1.15, B1.24Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy