K-Area Security Ready Room Additional Heating, Ventilation, and Air Conditioning Units CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Dismantlement and Removal of K-Area Purification Steam Supply Line CX(s) Applied: B1.27Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Develop Cost-Effective Biological Removal Tech for Se and NO3 from FGD Wastewate CX(s) Applied: A9, B3.6Date: 08/12/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
B-90 Air Compressor Replacement CX(s) Applied: B1.15, B2.2Date: 08/12/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Remove/Replace Floor Tile at 702-K & 702-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
New Heating, Ventilation, and Air-Conditioning System for L-Area Complex CX(s) Applied: B2.1Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 713-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Remove Inductively Coupled Plasma Mass Spectrometer from B147/151 CX(s) Applied: B1.31Date: 08/12/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office