Remove Damaged Parts and Clean Switchgear at 681-3G CX(s) Applied: B1.3Date: 03/29/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Herbicide Application at 11 Substations located in Arizona and Nevada, 2016-2017 CX(s) Applied: B1.3Date: 03/29/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region
B-141 Transfer CX(s) Applied: A1, B1.36Date: 03/28/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Tritium Extraction Facility Diffuser System Stacking Capability Expansion CX(s) Applied: B1.31Date: 03/28/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Surprise Lake Substation Sale of Land Rights and Equipment CX(s) Applied: B1.24Date: 03/28/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wren Substation Fence Replacement CX(s) Applied: B1.11Date: 03/28/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Data Collection and Comparison with Forecasted Sales of Five Lamp Types RIN NA CX(s) Applied: A6 EERE-Buildings Technology Program Date: 03/25/2016 Location(s): Nationwide Office(s): Golden Field Office
Subcontractor Will Provide Roof Repairs at 661-6E CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
284-H Battery Room Relocation CX(s) Applied: B1.15, B1.23Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office