Relocate Fire Control Panel and Remove Neutron
Install Pedestrian Signal Lights at Crosswalks CX(s) Applied: B2.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor to Repair Roof Leaks at 766-H CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Idaho National Laboratory Research Center E-85 Fuel Station Removal CX(s) Applied: B5.22Date: 09/16/2015 Location(s): IdahoOffices(s): Nuclear Energy
Materials and Fuels Complex (MFC)-774 Central Alarm Station Remodel CX(s) Applied: B2.1Date: 09/16/2015 Location(s): IdahoOffices(s): Nuclear Energy
Balancing Authority Area Services Agreement with Georgia-Pacific Consumer Products (Camas) LLC CX(s) Applied: B4.1Date: 09/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Novel High Temp Carbide & Boride Ceramics for Direct Power Extraction Electrode CX(s) Applied: A9, B3.6Date: 09/16/2015 Location(s): FloridaOffices(s): National Energy Technology Laboratory
SOFC Prototype System Test CX(s) Applied: B3.6Date: 09/16/2015 Location(s): ConnecticutOffices(s): National Energy Technology Laboratory
Metal 3D Printing of Low-NOX Fuel Injectors with Integrated Temperature Sensors CX(s) Applied: A9Date: 09/16/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
US-INDIA CONSORTIUM FOR DEVELOPMENT OF SUSTAINABLE ADVANCED LIGNOCELLULOSIC BIOFUEL SYSTEMS Award Number: DE-PI0000031 CX(s) Applied: A9, B3.6, B5.15 Bioenergy Technologies Office Date: 09/16/2015 Location(s): Florida Office(s): Golden Field...