Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 25, 2017This project would remove and replace the existing 15-kilovolt Zone 11 electrical interconnect due to a weather event in 2015 that caused an arc fault event that resulted in catastrophic damage to the switchgear.