Categorical Exclusion (CX) Determinations By Date

Addition of a Class 3B Laser to the High Pressure Water Tunnel Project CX(s) Applied: B3.6Date: 02/01/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
West Hackberry Rework 42-inch Crude Oil Pipeline Mainline Valves CX(s) Applied: B1.3Date: 01/29/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
STM S&TF Structural Modifications, NREL Tracking No. 16-004 Award Number: DE-AC36-08GO28308 CX(s) Applied: B2.5, DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 01/28/16 Location(s): CO Office(s): Golden Field Office