Subcontractor will provide roof repairs at 782-20G, 704-22G, and 704-25G.…
Modify Section B Main Floor Service Corridor and adjacent spaces to provide a contiguous contamination area between the lab modules in thisportion …
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
The process allows for obtaining simultaneous thermogravimetric and calorimetric measurements of materials (e.g catalysts).…
Subcontractor will provide roof repairs at 704-2H.…
Dominion Energy to install new guy anchors due to transmission pole work near 751-B (Station 72).…
This activity is for the potentiometric measurement of uranium (U) content for a wide variety of samples.…
Award Number: DE-EE0009083, CX(s) Applied: A9, B5.1, Building Technologies Office, Location(s): WI, Office(s): Golden Field Office
Award Number: DE-EE0009108, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office