Bonneville Power Administration (BPA) proposes to allow Weyerhaeuser to improve 1.1 miles of an existing access road in BPA’s fee-owned right-of-wa…
BPA is proposing to conduct inspection & repair of transmission tower steel lattice legs and concrete footings at transmission structures of the Ch…
General Powder/Solid Material Combination Studies to evaluate various combinations of powder/solid material for fabrication into a durable form.…
This activity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flum…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
Welding repairs on Steam Lines.…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.2, NREL, Location(s): CO, Office(s): Golden Field Office
This revision evaluates a new set of tests at different locations and does not include activities discussed in the original environmental checklist…
This revision evaluates a new set of tests at different locations and does not include activities discussed in the original environmental checklist…
The U.S. Department of Energy, Richland Operations Office, Security, Emergency Services & Information Management Division, proposes to construct a …