Excavate to correct the underground domestic water leak Southeast of 281-15H…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
Award Number: DE-EE0009122, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): MI, Office(s): Golden Field Office
Award Number: DE-EE0009140, CX(s) Applied: A9, B3.6, B2.2, Advanced Manufacturing Office, Location(s): DC, Office(s): Golden Field Office
The purpose of this EC is to replace the existing cask bagging ring vacuum and purge system controls in the Hot Fuel Examination Facility (HFEF), M…
In support of this project, INL subject matter experts (SMEs) will conduct the following tasks and level of effort (LOE) work.…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…
LM is proposing to redevelop one standpipe (MW-02) in the disposal cell toe at the Rifle, Colorado, Disposal Site to clear the standpipe of biofou…