The Bonneville Power Administration (BPA) is proposing to improve an access road along the Marion-Alvey No. 1 Transmission Line within BPA’s Alvey …
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the below …
Computational simulations of sCO2 combustor, experimental measurements in non-reacting sCO2 loop. …
This project aims to develop a novel end-to-end trainable Deep Analysis Net with Causal Embedding for Coal-fired power plant Fault Detection and Di…
Installation of a 110/208v back-up generator for Building 17. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Ault-Craig (AU-C…
Bonneville Power Administration (BPA) proposes to allow Avista to construct a communications facility on land that is under Federal jurisdiction. A…
Replace the failing cooling tower for Buildings 23 and 24 with a new tower. …
Build a self-supporting metal structure with electrical charging stations & safety eye washes to centralize the charging of the site forklifts & ma…
Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…