Develop a Blockchain-based provenance platform that would track data flow traffic from sensors deployed in fossil-based power plants and detect ide…
Existing data analysis to determine location for newly drilled Geo-laboratory test well. …
The under-construction Fleet Services Building (FSB) – a 36,000 square-foot multi-purpose mobile equipment and transportation center in the JD Ross…
WAPA proposes to demolish the existing building and construct a new building, with the intent to reuse the current foundation. The project also in…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the above …
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
Award Number: DE-EE0008537, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0008777, CX(s) Applied: A9, Water Power Technologies Office, Location(s): CA, Office(s): Golden Field Office
To produce a complex cooled turbine vane from additively manufactured (AM) ceramic matrix composite (CMC) materials enabled by stereolithography. …
To use AM (additive manufacturing) technology to develop improved overall cooling effectiveness for turbine components, particularly vanes and blad…