The Western Area Power Administration (WAPA) is proposing to reduce incompatible vegetation and fuel loading within the Right-of-Way (ROW) along th…
The Life Safety System (LSS) for the Specific Manufacturing Capability (SMC) and Test Area North (TAN) is over 20 years old, and replacement parts …
The existing fence line at Kalispell Substation is incomplete. The main gate is missing, so the public can walk up or drive up to the control house…
AT&T proposes to upgrade their wireless communications infrastructure that is currently located on BPA’s existing Mt. Blyn communications tower. …
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…
Sampling crew will Collect 1” x 18” sediment cores and surface water samples from the Steeds Pond Soil Contamination Area.…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…