Fabricate and install new sign on existing frame at Building 719-5N. Scrape and paint sign frame.…
Clean & paint Heat Exchanger covers at K-Area (Far Side) Handball Court.…
Install outdoor shade sails in B-Area.…
Western Area Power Administration (WAPA) proposes to replace existing Structures 28/8, 28/9, and 29/2 along its Kersey West - Willoby (KRW-WBY) 115…
Design, fabricate and laboratory test a SiC based 100 kVA module that can (later) be used as a basis for constructing a modular low-cost SiC-based …
U1a Modernization (U1a-M) is a multi-year set of activities and projects that would design and construct the necessary infrastructure and utilities…
Fabricate and process various agarose-based diffusive gradients in thin films (DGT) samplers.…
Replace Carpet on Second Floor in Building 730-2B.…
CX-020237: Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator
Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator.…
In support of activities at PBF-622, the proposed action leases and installs two 12' x 56' office trailers on the asphalt on the north side of PBF-…