Develop and test a treatment process that utilizes produced water and waste heat to create chemical and energy synergisms in cooling tower blowdown…
Design, manufacture & install on an electrical grid a 60 MVA flexible large power transformer (LPT). Also, R&D to improve protective relays and dis…
Valve FE-2301 (H-264002-EXTR-HV-138) will be replaced with a like-for-like valve; however, the new valve will have an additional functionality of a ma
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/9, 11/2, 12/8, 19/5, and 23/7 on i…
The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …
BPA is proposing to fund Polk Soil and Water Conservation District (PSWCD) to purchase the Smithfield Oaks property, which is a 179-acre parcel of …
Utilize high-performance computational tools to accelerate computational fluid dynamics (CFD) calculations to analyze particle impingement within a…
Paint walls/door, replace floor tile, and ceiling tiles in Building 704-K Room 161 and prep/paint 704-K lunch room walls, doors, and replace ceilin…
The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Remove, replace, reinstall HPC-TRP-002 (steam trap) associated piping, insulation (non-asbestos). There is an associated presumed asbestos contain…