Removal of suspect asbestos gaskets from valves in Building 703-A to facilate replacement of relief valves, steam traps, and/or other valves associ…
Trailers are to be moved to support Saltstone Disposal Unit 7 construction.…
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Remove and replace carpet in rooms 569, 570, 567, 566, 565, 564, 563, 562, 598, 597, 596, & 572. Rooms 596, 597, & 598 will have asbestos tile to …
As part of the C-Area Ground Water (CAGW) Removal Action and to reduce the risk of injury, Area Completion Projects will install handrails at the C…
Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing.…
This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
Corrosion testing per ASTM standards on stainless steels and corrosion-resistant alloys for intergranular corrosion susceptibility performed on met…
SRNL will perform batch contact and column testing of Crystalline Silicotitanate (CST) Ion Exchange media with simulant waste supernate. …
Small samples (less than 100 mg) of porous aluminosilicate zeolite material are analyzed in an Autosorb iQ gas sorption analyzer manufactured by Qu…