Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, 730-4B, and 703-1B.…
Install VTC in room 344 of 730-1B.…
Install additional 120V receptacles in Rooms 106, 107, and 185 of Building 703-47A.…
Install a 250V, 20A, NEMA 6-20R receptacle with cover plates in room 126 of 773-52A.…
This project includes taking soil samples at the H, K, and L-Area Ash Basins, and conducting visual inspections for ash along transects todelineate…
Landowners adjacent to the Idaho National Laboratory (INL) Site’s northeast boundary have encroached on INL property. The proposed action surveys a…
Up to 17 survey lines are proposed for SASW testing near seismic velocity boreholes and existing INL seismic stations at: ATR (Figure R-1A), NRF (F…
Bonneville Power Administration (BPA) proposes to continue funding the Pacific States Marine Fisheries Commission (PSMFC) for ongoing work on the C…
The U.S. Department of Energy (DOE) proposes to maintain on-going operations and research activities at the Lawrence Berkeley National Laboratory …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Timnath-Ault(TNH-…