Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is required. These excavati…
The South Texas Project (STP) Nuclear Operating Company, in collaboration with Illinois Fire Service Institute (IFSI), proposes to develop and impl…
Bonneville Power Administration (BPA) is proposing to allow Comcast to place a buried fiber optic cable on BPA easement in Beaverton, OR.…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment to locate, excavate, and inspect an internal corrosion …
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…
Chevron seeks to export the LNG in a volume equivalent to approximately 72 billion cubic feet (Bcf) of natural gas on a cumulative basis for a two-year period commencing on the date of issuance of DOE’s order.
Western Area Power Administration (WAPA) plans to conduct geotechnical investigations at up to 26 locations to determine if transmission line const…
Bonneville Power Administration (BPA) proposes to acquire approximately 800 easements from the Montana Department of State Lands for its existing t…
BPA proposes to replace non-ceramic insulators (NCIs) with ceramic insulators on sections of the Eugene-Alderwood, Albany-Eugene, Parker Tap, and J…