Tritium Extraction Facility, TEF, Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
Award Number: DE-EE0008919, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IL, Office(s): Golden Field Office
BPA proposes to replace the SPAR arm and replace or reinforce hardware on SPAR arms at transmission poles for fire mitigation.…
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…
SWPA proposes to rebuild 7.57 miles of 161kV Transmission Line 3001, between structure 693 and Dardanelle Tap.…
SWPA proposes to rebuild the transmission line between Clarksville Substation and Structure 693, Line 3001, replacing poles, structures, crossarms,…
Award Number: DE-EE0008658, CX(s) Applied: A9, B5.16, State Energy Program, Location(s): NH, Office(s): Golden Field Office
Award Number: DE-EE0008680, CX(s) Applied: A9, B3.2, B3.6, Building Technologies Office, Location(s): GA, Office(s): Golden Field Office
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, A11, B1.24, B3.6, NREL, Location(s): CO, Office(s): Golden Field Office