Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…
Replace Discharge Pump #1 at the 607-1M lift station due to failure.…
2D seismic data acquisition. …
Southwestern Power Administration proposes Build a 30' X45' pre engineered garage and pad at Nixa PCC for vehicle storage. …
Award Number: DE-EE0008497, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): WI, Office(s): Golden Field Office
Award Number: DE-EE0008625, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0007826, CX(s) Applied: A9, B3.16, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0008756, CX(s) Applied: A9, B5.15, Solar Energy Technologies Office, Location(s): Multiple, Office(s): Golden Field Office