BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
The project will perform LIBS experiments
Adding additional grab ports to the MS3 grab sample manifold.…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
A High Performance Liquid Chromatography (HPLC) system is used by Analytical Development for organic sample analysis. Sample aliquots injected into…
This R&D project will be examining separation of various uranium salts from environmental samples. The separation will employ solvent extraction us…