BPA is proposing to fund the Confederated Salish and Kootenai Tribes to purchase the Revais Westslope property, a 2.5-acre parcel of land located 6…
Bonneville Power Administration (BPA) is proposing to resurface the bridge crossing of Butte Creek, which leads to BPA’s Raymond Substation. The br…
Award Number: DE-EE0008525, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0008770, CX(s) Applied: A9, A11, Solar Energy Technologies Office, Location(s): NC, Office(s): Golden Field Office
Award Number: DE-EE0008791, CX(s) Applied: A9, A11, Geothermal Technologies Office, Location(s): TX, Office(s): Golden Field Office
Develop a cost-effective quality assurance (QA) method that can rapidly laser powder fusion (LPBF) additive manufacturing (AM) technology for hot g…
Develop improved, low-pressure loss rotating detonation engine (RDE) designs through a joint experimental and computational program with natural ga…
Safely remove from SRS property trailers 772-29G, 782-5G, and 782-10G. Safely demolish SRS property trailer 782-13G. Demolished trailer will be di…
Isolate the KAC Cf-252 Shuffler, Shuffler Instrumentation Cabinets, and Shuffler Room lighting and receptacles from all Electrical Power Sources an…
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…