WAPA proposes to demolish the existing building and construct a new building, with the intent to reuse the current foundation. The project also in…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at the above …
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
Award Number: DE-EE0008537, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0008777, CX(s) Applied: A9, Water Power Technologies Office, Location(s): CA, Office(s): Golden Field Office
To produce a complex cooled turbine vane from additively manufactured (AM) ceramic matrix composite (CMC) materials enabled by stereolithography. …
To use AM (additive manufacturing) technology to develop improved overall cooling effectiveness for turbine components, particularly vanes and blad…
Multiple candidate energy storage options for fossil fuel-based power plants will be evaluated before selecting the most promising concepts for whi…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
QuesTek will lead the overall STTR program with the long-term objective to design and fabricate a functionally graded material (FGM) component, joi…