Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer model…
Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
A single partial can of Leak-Tec 72V was found during a review of the gloveboxes as part of the facility lay-up preparations. Waste removed from t…
Replace all exterior light fixtures on 233-23H and 233-24H with LEDs.…
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Paint Rooms 243, 244, 334, 336, and 337. Replace carpet in Room 243. Activities will occur in Building 730-B.…
Install a new chain link fence for the switchyard at SCE&G substation 72 (751-B).
Award Number: DE-EE0008639, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office