The subcontractor, Queen City Railroad Construction, shall replace wooden line switch ties from the railroad bed, identified by site transportation…
The Fischer-Tropsch Synthesis, gaseous-phase reaction, will be performed in stainless steel vessels and reaction products analyzed by gas chromatog…
Tritium Extraction Facility, TEF, Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Empty Shipping Containers require annual maintenance and testing to ensure the container meets all SARP requirements.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory, Building 999-1W…
There is a need for easier access to the 234-H Heating and Ventilation, H and V, elevated platform. Stairs will be added to the H and V platform.…
The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
Award Number: DE-EE0008919, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IL, Office(s): Golden Field Office
BPA proposes to replace the SPAR arm and replace or reinforce hardware on SPAR arms at transmission poles for fire mitigation.…
SWPA proposes to rebuild 7.57 miles of 161kV Transmission Line 3001, between structure 693 and Dardanelle Tap.…