The preliminary scope of the project includes the design, construction, and start-up of a facility of 38,000 to 45,000 GSF in a two to three story…
Award Number: DE-EE0008739, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0008781, CX(s) Applied: A9, Water Power Technologies Office, Location(s): MO, Office(s): Golden Field Office
BPA proposes to acquire a conservation easement to be granted by the Washington Department of Natural Resources (WDNR) on 40 acres in King County, …
DOE LM is proposing to install aerial survey quality control monuments for future aerial survey activities at the Shirley Basin South, disposal sit…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…
Research on Thermal Energy Storage at coal-fired power plants to improve unit flexibility. The project will develop thermosiphons immersed in cemen…
To develop a physics-based concurrent multiscale framework to model the highly nonlinear temperature and time dependent damage mechanisms and mater…