BPA proposes to replace deteriorating wood-pole structures (including, cross arms, insulators, guy anchors, etc.) along the specified line. Replace…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
The Air Drop Mission Planner System is an aircraft tool in the aircraft that calculates an acceptable cargo release point when given a desired land…
Award Number: DE-EE0008775, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): UT, Office(s): Golden Field Office
Award Number: DE-EE0008769, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): NJ, Office(s): Golden Field Office
Completion of FEED study, NEPA, and permitting for 10 MWe CO2 absorption pilot at CWLP host site, TEA update, and updating costs and schedules for …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management within the right-of-way (R…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace one 115-kV oil circuit breaker (OCB) and associated equi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace one 12.47-kV oil circuit breaker (OCB) and associated eq…