Construction to pour concrete pad for outdoor unit installation East side of 704-72S and install Ductless Heat Pump on pad and install three High W…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…
This EEC covers the operation of the Extrel TDS system located in EMRL 999-2W Lab 196. …
This EEC covers the testing and disposal of a propietary ZAO Non-Evaporative Getter (NEG) that will be obtained from SAES Getters through a nondisc…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.1, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009237, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): MN, Office(s): Golden Field Office
Award Number: DE-EE0009263, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): GA, Office(s): Golden Field Office
The Virginia Polytechnic Institute and State University (Virginia Tech), in collaboration with the Mechanisms Engineering Test Loop Facility (METL)…