A supplemental purge ventilation system is required to support the Pulse Tube Agitator (PTA) operation in FPP-1 during future transfers. Higher ve…
Remove from SRS Trailer 703-18B, Executive Mobile Portalet 724-42E (located in B Area), and 3 transformers. Relocate Trailer 703-18B to Z-Area. De…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. stainless steel).…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Install additional receptacles and paint in Room 135 of Building 730-2B.…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Spook disposal site. Aerial survey control monume…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Edgemont disposal site. Monuments would be constr…
The Bonneville Power Administration (BPA) proposes to repair damaged goat peaks on structures 61/3, 61/4, 61/5 along the Schultz-Raver No. 1 500 kV…
The Bonneville Power Administration (BPA) proposes to replace 17 deteriorating wood poles and associated structural/electrical components (e.g. cro…