This proposed activity will repair damage to the 221-H roof in an HB-Line storage area resulting from scaffling being blown over during a storm eve…
The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…
Duke University will investigate the chemical forms of arsenic and selenium in coal fly ash and improve methods for characterization.…
BPA proposes to adjust its power and transmission rates for fiscal year 2020 and 2021. In December 2018, BPA initiated a proceeding pursuant to the…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to upgrade an existing telecommunications facility located on BPA fee-owned proper…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and equipment at an existing site called Rocky Flats. The…
Award Number: DE-EE0008406, CX(s) Applied: A9, B3.6, Building Technologies Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0008794, CX(s) Applied: A9, A11, B3.1, Geothermal Technologies Office, Location(s): TX, Office(s): Golden Field Office
The CEBAF Renovation
Design, engineer, fabricate, lab test, and then field test a well logging system for unconventional boreholes.…