Wash/clean, caulk, and repaint Trailer 704-74F.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
Painting the exterior of Building 701-1L.…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
LM is proposing to install fence flagging as a wildlife habitat improvement at the Gunnison site. The proposed action is intended to enhance wildli…
The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 …
The Western Area Power Administration (WAPA) is proposing to replace insulators at Structures 92/1 - 92/3 on the Glen Canyon (GC) - Flagstaff (FLG)…
Award Number: DE-EE0008793, CX(s) Applied: A9, A11, Geothermal Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0008735, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Removal of presumed asbestos containing material (PACM) gaskets to replace plastic relief valve (PSV 002) for Phosphate pump 002 located inside 789…