Award Number: DE-EE0008727, CX(s) Applied: A9, B3.3, B3.6, Wind Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Advanced electrochemical sensors will be tested on site to validate the laboratory results.…
Funding will support the project team's information gathering and analysis efforts to at provide a blueprint for an end-to-end, data-driven approac…
The objective of this project is to develop a neural network-based interaction (drag and lifting) force model. …
EERC will assist Minnkota with site chracterization through the installation of a deep characterization well and two associated water monitoring we…
The EEC was revised to include the United States Forest Service, USFS, the design and installation of the access roads and turn around points to tw…
Remove heat exchanger plug covers and seal plugs and joints with Blue Max.…
Pave additional areas South of H-Tank Farm to support personnel.…
Modify and test applicable components of the 292-S Diesel Fuel Oil, DFO, Underground Storage Tanks System to include epoxying the spill buckets ass…
BPA proposes to improve or reconstruct portions of existing access roads to structures along the Thurston-McKenzie Transmission Line No. 1.…