The existing 217-H Air Handling Unit, HQ-234000-HVAC-AHU-53.007, will be replaced.…
Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
Replace the 720-2A Automatic Transfer Switch, A721-600-ATS-01, due to suspected lightning strike.…
NDE Inspection of the DBCF underground piping.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
The Process Technology Programs, PTP, will conduct laboratory scale simulations of the Defense Waste Processing Facility, DWPF, process at the Aike…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
Utilize real-time quantum dynamics simulations and quantum optimal control algorithms to harness near-surface nitrogen vacancy (NV) centers to dete…
Bench-scale studies, and design modification, analysis, fabrication, and field testing of a CO2 mineralization technology.…
BPA proposes to contribute funding to the Jefferson County Soil and Water Conservation District and the Oregon Department of Fish and Wildlife Lit…