The once-thru AHU and exhaust system for the Inert Loading Facility (rooms 324 and 325) shall be replaced with a system that is more reliable and m…
Replace caulking around all exterior windows, repair damaged sheetrock and repaint walls in offices 7, 9, 59, and 60 in Building 707-F.…
Warranty repair work on 902-4B Fire Water tank includes draining the tank, sanding interior seams of tank, then applying Epoxy to sanded areas. Rep…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…
Remove remaining floor tile from RBOF (Receiving Basin for Off-site Fuel) facility. Scope of work includes removing floor tiles, removing tile mast…
Installation of 6 New Trailers with Utilities and including sidewalks at 742-G Trailer Complex Area. …
The proposed activity is to allow discharge of non-process HVAC chill water to the stormwater ditch that goes to the constructed treatment wetland …
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals. …
719-N Prep and Paint 8 Concrete Bollards for High Visibility …