Two (CMP010A and CMP055A) or more additional groundwater monitoring wells to be installed within the Gordon Aquifer (GAU). Well CMP010A will be app…
The South Carolina Department of Health and Environmental Control (SCDHEC) has approved the MCB ARWs (MIS-001 to MIS-011) for dismantlement and rem…
Synthesis of semiconductor perovskites (CH3NH3)PbI(3-x)(BF4)x and (CH3NH3)SnI(3-x)(BF4)x for the detection and imaging of nuclear materials.…
Metallography examination of contaminated samples will be performed. Contaminated materials requiring metallurgical evaluation will be cut, if nec…
The Western Area Power Administration (WAPA) is proposing to dispose of out-of-service equipment at various WAPA facilities throughout Arizona. The…
This project develops and tests the mechanical properties of replacing 50% of carbon fiber with bamboo in a product to improve certain mechanical p…
This activity includes leachability testing of radioactive spiked monoliths as well as sorption and desorption of possible radionuclide spiked soli…
Award Number: DE-EE0008626, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): CO, Office(s): Golden Field Office
Purchase additional 8,000 lbs. of Ch R-22 and store estimated 16,000-18,000 lbs. of R-22. …
Old lathe will be dismantled and removed from Section 7 of the IML Glovebox. A new lathe will be procured and installed in Section 8 of the IML Glo…