BPA proposes to fund the Confederated Salish and Kootenai Tribes to purchase the 78-acre Crow and 30-acre Post Creek properties in Lake County, Mon…
Preparation of lab samples includes sectioning, mounting (hot and cold methods), planar grinding, polishing, heat treating, chemical etching, and e…
The objective is to design, construct, and test a novel, high-performance CO electrolysis reactor that produces two concentrated product streams: e…
Replace Substation 6 electrical switchgear and associated items-fencing, concrete pad, etc.…
Remodel the 1st and portions of the 2nd floors of B17 East Wing to provide updated offices with new furniture, doors, and fire suppression system, …
Rational Electrolyte Design for Li-ion Batteries with Micro-Sized Si Anodes…
BPA proposes to provide funds to the Confederated Tribes of the Umatilla Indian Reservation for activities to increase channel complexity and flood…
The scope of work would involve the demolition of building 04-026.…
This project includes replacement of the potable and fire water pipes on the NETL PGH R and D Plateau near the B-95 entrance gate and the Northeast…
Replace existing B-84 Summer Boiler and associated pumps and controls.…