The 216-L Sump Pump discharge check valves 216-A and 216-H need to be replaced.…
The proposed project will complete Hazardous Waste Management Act, HWMA, Resource Conservation and Recovery Act, RCRA, closure as detailed in the A…
Award Number: DE-EE0009101, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): LA, Office(s): Golden Field Office
A one-step Chemical Vapor Deposition (CVD) process to grow carbon nanoparticles and nanofibers (CNFs) during natural gas (NG) decarbonization.…
Development of a joint seismic-pressure-petrophysics inversion of continuous active source seismic monitoring. The work includes bench-scale lab wo…
Award Number: DE-EE0008979, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0008971, CX(s) Applied: A9, B1.31, B3.6, Solar Energy Technologies Office, Location(s): MA, Office(s): Golden Field Office
The Power Management organization at Idaho National Laboratory (INL) needs to perform maintenance and inspection activities on power poles andstruc…
The proposed action installs the following equipment in the Fuel Cycle Glovebox in Room 26 in the Fuel Conditioning Facility (FCF) at the Materials…
The proposed actionleases and installs two temporary office trailers, one in the area between TR-56 and MFC-793C shown in Figure 1, and the other d…