Pantex is proposing the design and construction of the Flexible Production Support Facility (FPSF).…
Award Number: DE-EE0009020, CX(s) Applied: A9, B3.6, B5.15, Solar Energy Technologies Office, Location(s): GA, Office(s): Golden Field Office
MOX-Termination has determined that portable building SRS-PB-EX-0027 is now excess.…
In 1990, the Hot Fuels Examination Facility (HFEF) completed a NEPA evaluation for installing a tritium monitoring system in the basement to monito…
Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Replace existing propane monitors at Building 754-11A.…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…
Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…