The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
This is a treatability study to mitigate glycolate in real DWPF sample liquid material with added Slurry Mix Evaporator (SME) slurry. …
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…
Since during operation of the 105-K KIS Vault uses compressed gas nitrogen and carbon dioxide as part of the process, potential gas leakage and asp…
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
Replace the existing metal halide and fluorescent lights in the K- Area 105-K building with LED Technology.…
Installation of new domestic water piping in J and S-Areas.…
The nature of this modification is to blow out the CW coils in the 234-4H Air Handling Unit (AHU) with air. To do this, each individual coil must b…
This activity is for completing deactivation of the 236-H By-Product Facility. This facility includes the retired Burst Test Process, the He-3 Puri…
Insulation and mastic to be removed from chilled water piping feeding AHU-002 at 702-2A. Section to be removed to allow access to a y-strainer for …