Phase II activities will include completing the NEPA and permitting process, revising the Front-End Engineering Design (FEED) if required, revising…
The overall objective of the project is to significantly improve the reliability and efficiency of existing coal-fired power plants under flexible …
Coal pyrolysis in existing facilities. Collection and upgrading of tars and oils in existing upgrading equipment for further utilization as feedsto…
Award Number: DE-EE0007347, CXs Applied: A9, B3.6, Water Power Technologies Office, Location: VA, Office: Golden Field Office
This project aims at developing and validating low-cost spinel-based materials synthesized with a multi-component alloy precursor for solid oxide f…
Project activities include the design, development, and field testing of environmentally safe contrast agents and geophysical methods to assess the…
B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…