This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket and gasket-likemater…
Install PA System from pole 265T to 716-4A.…
Two breathing air pass throughs are needed on the exterior walls of 234-7H to allow portable breathing air to be used within Building 234-7H.…
Renovation of restroom in Building 751-1A.…
Award Number: DE-EE0008732, CX(s) Applied: A9, B3.6, B3.16, Wind Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office
PNNL and its subcontractors perform safety and environmental improvements of facilities, including but not limited to, replacement and upgrade of f…
PNNL and its subcontractors perform safety and environmental improvements of facilities (including but not limited to, replacement and upgrade of f...
Award Number: DE-EE0009111, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): MI, Office(s): Golden Field Office
Ongoing routine maintenance at the WVDP and associated facilities and systems.…
Project management and planning; permitting; storage complex modeling. NRAP screening; drilling, sampling, and testing of stratigraphic test well. …