Bonneville Power Administration (BPA) is proposing to allow Comcast to remove and replace 128 feet of existing above ground strand and coaxial cabl…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair, and improvements on approximately 1,650 linear feet of …
Bonneville Power Administration (BPA) proposes to upgrade its VHF mobile radio system at BPA communication sites throughout its Mobile Radio Essent…
Award Number: DE-EE0008731, CX(s) Applied: A9, B3.6, Wind Power Technologies Office, Location(s): IA, Office(s): Golden Field Office
NCAT will employ advanced computational techniques to address the challenge of higher material deterioration facing the existing coal-fired power p…
Demonstrate a secure private blockchain protocol designed for fossil power generation systems. …
The objective of Phase II is to perform Front-End Engineering Design (FEED) study, NEPA documentation, and finalize project cost projections for th…
Award Number: DE-EE0008729, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): IA, Office(s): Golden Field Office
Award Number: DE-EE0008681, CX(s) Applied: A9, A11, Building Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0007855, CX(s) Applied: A9, B5.1, B5.16, B5.19, Weatherization & Intergov Program, Location(s): AK, Office(s): Golden Field Office