The objective of this project is to conduct a Front-End Engineering Design (FEED) study to capture CO2 emissions from flue gas generated at Calpine…
Design, build, and field test PEI-Monolith based CO2 capture unit for NGCC flue gas. Other work includes lab-scale testing, modeling (computer simu…
This replacement will result in a reduction of maintenance needs for the UPS units.…
Painting in the interior and exterior of 701-2K.…
741-N Empty and sort 3 Rad C roll off pans.…
This proposed activity will provide the mechanical replacement of the HVAC unit, A-723015-HVAC-ACU-001, located on the west side of building 723-15…
Remove approximately 10 feet of insulation on caustic line to identify and repair caustic leak.…
BPA proposes to replace structural components of the existing vehicle storage building at the Snohomish Substation with like materials and construction.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its North Gunnison-Skito (NGU-SKO) 115-kV Transmission Line.
The Bonneville Power Administration (BPA) proposes to allow the Pend Oreille Public Utility District (POPUD) to upgrade the existing secondary station service transformer at Sacheen Substation.