A load test is to be conducted on Melter Storage Box 3.…
Paint Fire Hydrants and PIV's in F-Area.…
709-1G, Replace tile and wallboard in ladies shower.…
Subcontractor will provide roof repairs at Building 263-170H (Tritium Warehouse).…
Subcontractor will provide roof repairs at 233-24H.…
This is a painting job to repair some fixed contamination on 281-1H Delay Basin where there is peeling.…
Remove, replace, and paint base board wall cove base in K-Area Reactor Building (105-K) Personnel Wing.…
D and R "lean to" style outdoor storage shed (NBN, no building number) attached to the 105-L building near the Purification wing.…
Prepare Hill-Acme Metalworker for excess by disconnecting electrical, draining fluids, and transporting to storage.…
Provide federal funding to the University of North Carolina at Chapel Hill (UNC) to develop materials and processes that result in efficient and st…