BPA proposes to remove the Big Eddy-Celilo No. 3 and No. 4 transmission lines that run between the Big Eddy Substation and the Celilo DC Converter …
The scope of the Simulation Development Laboratory/Bettis Reactor Engineering School Project is expected to include the demolition of the existing …
BWXT Advanced Technologies LLC proposes to conduct research and development activities to support conceptual design of a modular high-temperature g…
General Atomics proposes to conduct research and development activities to support conceptual design of a gas-cooled fast modular reactor.…
Modify existing ground grid. Add additional crushed stone to the substation paving and install a new security fence. Drainage improvements (e.g. cu…
Accelerating AFV Adoption in Mid-America…
Objective is to integrate the liquid salt combined-cycle (LSCC) design in a combined cycle environment, interfaced with existing natural-gas combin…
Award Number: DE-EE0007349, CX(s) Applied: A9, B5.25, Water Power Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009274, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): AZ, Office(s): Golden Field Office
Award Number: DE-EE0009288, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office