The Westinghouse Electric Company, in collaboration with the Idaho National Laboratory, Texas A and M University, and Los Alamos National Laborator…
The IF-611 and IF-627 fire protection panels and the associated fire protection devices in these buildings, need to be upgraded to increase system …
Current facilities at the Advanced Test Reactor (ATR) Complex that house food services, meetings, training space, and administrative and support of…
The scope of this project includes the removal of the existing 40'x40'x9" thick concrete pad, the construction of approximately a 50'x50'x4' thick …
Award Number: DE-EE0009270, CX(s) Applied: A9, B3.6, B1.26, Bioenergy Technologies Office, Location(s): IL, Office(s): Golden Field Office
BPA proposes to reterminate the existing 230 kilovolt (kV) capacitor banks and upgrade the sectionalizing bus work located at BPA’s Tacoma Substati…
Award Number: DE-EE0009344, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): DE, Office(s): Golden Field Office
The scope of this project is to upgrade the Kesselring Site (KS) Site Service Water (SSW) and the Sanitary Sewer (SS) systems.…
Award Number: DE-EE0009329, CX(s) Applied: A9, B1.31, B3.6, Solar Energy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0009264, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CO, Office(s): Golden Field Office