Provide federal funding to the University of Minnesota (UMN) to improve the use of vapor transport thin film deposition (VTD) to fabricate high eff…
BPA proposes to fund Washington Department of Fish and Wildlife (WDFW) for the removal of a house, outbuildings, and debris at the existing Chinook…
Perform the work in connection with the Janitorial Services Contract at the SPR Site Big Hill.
HVAC Chiller No. 1 cooling water vent valve is to be replaced with a lighter one and pipe hangers are to be reinforced.…
Repair reinforced concrete wall located at the east side of 730-4B building.…
Replace lights in building 789-2B. Use scaffold platforms needed.…
Isolate and abandon electrical services to various equipment in Sample Room No. 1 and No. 2 in 105-L.…
Repair damaged portion of the roof on the west end of building 710-8N.…
Weld repairs and coating on door hinges on the north east end of 711-6N.…
Replace the current A/C unit for Conference Room a with a new Carrier 3-Ton split HVAC unit.…